Mumbai: Trials on 3km Marol Metro stretch delayed

Palpebral

New member
Mumbai: Trials on 3km Marol Metro stretch delayed
Two rakes which were expected to arrive by now for trials for the Metro 3 corridor—Colaba-Bandra-Seepz—have not been dispatched from their manufacturing facility in Hyderabad.