P Palpebral New member 2 Nis 2022 #1 Mumbai: Trials on 3km Marol Metro stretch delayed Two rakes which were expected to arrive by now for trials for the Metro 3 corridor—Colaba-Bandra-Seepz—have not been dispatched from their manufacturing facility in Hyderabad.
Mumbai: Trials on 3km Marol Metro stretch delayed Two rakes which were expected to arrive by now for trials for the Metro 3 corridor—Colaba-Bandra-Seepz—have not been dispatched from their manufacturing facility in Hyderabad.